About Project

Supply and Installation of Etobicoke General Hospital Phase 1 Patient Tower Project PA System in accordance with Osler Equipment, Existing Equipment, and Osler procured Equipment List.

Equipment includes GLOBALCOM Head-end Controller, DNA Amplifiers (covers 24 zones) throughout the hospitals’ level, Logic Inputs/Outputs, Desktop Microphone Station, Loudspeakers, DSPs, PA control system and PA equipment rack.  System is interfaced with the VoIP, locally and remotely, public/selective zone pages can be accessed.

Integrated Coaster Pagers for client/staff waiting room.

  • ContractorWalsh Group / Black and McDonald Ltd.
  • RepDateJune 2019
  • LocationEtobicoke, Ontario
  • Cost$300K CAD
  • SystemAtlasIED